Skip to main content

May 19, 2026 Archived

On-Premises Hardware Considerations

When determining the hardware sizing for yout Workspace ONE UEM deployment, there are some additional things to consider besides just the number of devices. In addition to general considerations, learn more about considerations for your servers, hardware, and Workspace ONE UEM components.

The following are assumptions that help you determine if you must adjust the hardware requirements shown in the sizing tables based on the hardware needs of your environment.

Additional requirements for the components listed below can be found in their respective sections. View the sizing tables at on-premises Architecture Sizing for up to 25,000 Devices, on-premises Architecture Sizing for up to 50,000 Devices, or on-premises Architecture Sizing for up to 100,000 Devices.

General Considerations

  • High Availability is easily accomplished in Workspace ONE UEM but affects your requirements. Contact Workspace ONE UEM Support if you need further assistance, since every deployment is unique and has its own requirements.

  • Support for TLS 1.0, 1.1, and 1.2 is provided.

  • Sizing estimates include allocation for 1 GB of cumulative app storage. Increase the server disk space and DB disk space to account for increased storage (for example, a 5 GB app deployment requires an extra 4 GB disk space for the database and application servers).

  • Sizing estimates include allocation for 1 GB of cumulative content storage for the Omnisssa Content Locker. Increase the server disk space to account for increased storage (for example, 5 GB of content requires an extra 4 GB disk space for the application servers).

  • Servers must be set up in English. Workspace ONE UEM must be set up on an English operating system.

Database Server Hardware Considerations

Unless otherwise specified, the following assumptions are made regarding server hardware used to host the Workspace ONE UEM database:

  • You can install the Workspace ONE UEM database on physical or virtualized hardware.

    • If installing on virtualized hardware, ensure you are following the Omnissa and Microsoft best practices for SQL deployments. Also ensure I/O requirements can be met and the overall virtual architecture supports Workspace ONE UEM requirements.
  • Workspace ONE UEM and Workspace ONE Access are implemented on a standalone database.

  • NTFS should be selected for the file system where the database files reside.

    • FAT32 would not be supported because database files can grow past 4GB.

Other Workspace ONE UEM Components

The following sections show the hardware assumptions for various Workspace ONE UEM components. They are listed here to give you an idea of what you will need to configure them based on the needs of your deployment. Each component has a separate guide, available in Omnissa Product Documentation, that you can reference for additional requirements and information.

Workspace ONE Access Hardware Sizing

The following assumptions are made regarding server hardware used to host Wokspace ONE Access. For sizing above the highest amount, contact Workspace ONE UEM Support.

Number of Users 1,000 to 10,000 10,000 to 25,000 25,000 to 50,000 50,000 to 100,000
CPU cores 3 load-balanced servers with 2 CPU cores 3 load-balanced servers with 4 CPU cores 3 load-balanced servers with 8 CPU cores 3 load-balanced servers with 8 CPU cores
RAM 6 GB each 8 GB each 16 GB each 32 GB each
Hard Disk Space 60 GB each 80 GB each 80 GB each 100 GB each

Database Sizing Increase

When you deploy Workspace ONE Access, you must increase the size of your Workspace ONE UEM database.

Number of Users 1,000 to 10,000 10,000 to 25,000 25,000 to 50,000 50,000 to 100,000
CPU cores +2 CPU cores +4 CPU cores +8 CPU cores +8 CPU cores
RAM +4 GB each +8 GB each +16 GB each +32 GB each
Hard Disk Space +50 GB each +50 GB each +100 GB each +100 GB each
IOPS +1000 +1000 +1000 +1000

An Intel processor is required. CPU Cores should each be 2.0 GHz or higher.

AirWatch Cloud Connector Server Hardware Sizing

The following assumptions are made regarding server hardware used to host the AirWatch Cloud Connector. For sizing above the highest amount, contact Workspace ONE UEM Support.

Number of Users 1,000 to 10,000 10,000 to 25,000 25,000 to 50,000 50,000 to 100,000
ACC Requirements
CPU Cores 2 CPU cores 2 servers with 2 CPU cores 2 servers with 2 CPU cores 3 servers with 2 CPU cores
RAM 4 GB 4 GB each 4 GB each 8 GB each
Disk Space 50 GB 50 GB each 50 GB each 50 GB each

Notes:

  • Multiple AirWatch Cloud Connectors in the same organization group that connect to the same AWCM server for high availability can all expect to receive traffic (a live-live configuration). How traffic is routed is determined by AWCM and depends on the current load.

  • CPU Cores should each be 2.0 GHz or higher. An Intel processor is required.

  • Disk Space requirements include: 1 GB disk space for the AirWatch Cloud Connector application, Windows OS, and .NET runtime. Additional disk space is allocated for logging.

Workspace ONE Access Connector Hardware Sizing

The Workspace ONE Access Connector component has the following additional requirements. If you are installing both the ACC and Workspace ONE Access components, add these requirements to the ACC requirements.

Number of Users 1,000 to 10,000 10,000 to 25,000 25,000 to 50,000 50,000 to 100,000
 
Workspace ONE Access Connector Requirements
CPU Cores 2 load-balanced servers with 2 CPU Cores 2 load-balanced servers with 2 CPU Cores 2 load-balanced servers with 2 CPU Cores 2 load-balanced servers with 4 CPU Cores
RAM 8 GB each 8 GB each 8 GB each 8 GB each
Disk Space 40 GB each 40 GB each 40 GB each 40 GB each
Special Configuration Directory service xmx = 4g Directory service xmx = 4g Kerberos Service xmx = 1g User Auth Service xmx = 1g

Notes:

  • CPU Cores should each be 2.0 GHz or higher. An Intel processor is required.

  • Disk Space requirements include: 1 GB disk space for the Workspace ONE Access Connector application, Windows OS, and .NET runtime. Additional disk space is allocated for logging.

Secure Email Gateway Server Hardware Sizing

The following assumptions are made regarding server hardware used to host the Secure Email Gateway (SEG) application.

Sizing for SEG V2 on UAG

Concurrent Connections Up to 6,000 6,000 to 10,000 10,000 to 50,000 50,000 to 100,000 100,000 to 150,000 150,000 to 200,000
Max with Transformation enabled 4000 6000 35000 70000 100000 140000
UAG Sizing 4GB RAM / 2vCPU 4GB RAM / 2 vCPU 16GB RAM / 4vCPU 16GB RAM / 4vCPU 32GM RAM / 8vCPU 32GM RAM / 8vCPU
Number of UAG Appliances 1 2 4 7 5 8

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Note: Considering SEG transformation enabled

Sizing for All UEM Services Enabled (Workspace ONE Tunnel, Content, and SEG on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 large UAG Appliance (4 CPU Cores) 2 large UAG Appliance (4 CPU Cores) 9 large UAG Appliances (4 CPU Cores each) 19 large UAG Appliances (4 CPU Cores each) 29 large UAG Appliances (4 CPU Cores each) 19 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 16 GB 16 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Note: Considering SEG transformation enabled

Sizing for SEG V2 (Legacy non UAG)

SEG CPU Core RAM Notes
SEG without content transformation 2 4 GB Per 8,000 devices, up to a maximum of 32,000 devices (8 CPU/ 16 GB RAM) per application server.
SEG with content transformation (Attachment handling, hyperlinks security, tagging etc.) 2 4 GB Per 4,000 devices (2,000 devices per core) per application server, up to a maximum of 16,000 devices (8 CPU/16 GB RAM). Performance varies based on the size and quantity of transforms. These numbers reflect a deployment with a high number of content transforms. Sizing estimates vary based on actual email and attachment usage.

Notes for SEG deployments: 

  • It is possible to deploy only a single UAG Appliance as part of a smaller deployment. However, Omnissa recommends deploying at least 2 load-balanced appliances.

  • To achieve HA, add N+1 Servers

  • An Intel processor is required. CPU Cores should each be 2.0 GHz or higher.

  • The minimum requirements for a single SEG server are 2 CPU cores and 4 GB of RAM.

  • When installing SEG servers in a load balanced configuration, sizing requirements can be viewed as cumulative. For example, a SEG environment requiring 4 CPU Cores and 8GB of RAM can be supported by either:

    • One single SEG server with 4 CPU cores and 8GB RAM.

      or

    • Two load balanced SEG servers with 2 CPU core and 4GB RAM each.

  • 5 GB Disk Space needed per SEG and dependent software. This does not include system monitoring tools or additional server applications.

Workspace ONE Tunnel and Unified Content Gateway (Tunnel) Hardware Sizing

The following assumptions are made regarding server hardware used to host the Workspace ONE Tunnel. For sizing above the highest amount, contact Workspace ONE UEM Support.

Hardware Sizing

Use the table to determine the sizing requirements for your deployment. Each column represents the requirements for a deployment up to that number of devices. The columns are not cumulative – each column contains the exact requirements for the listed number of devices.

Sizing for Single Service Enabled (Workspace ONE Tunnel on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 standard UAG Appliance (2 CPU Cores) 1 standard UAG Appliance (2 CPU Cores) 1 large UAG Appliances (4 CPU Cores each) 2 large UAG Appliances (4 CPU Cores each) 3 large UAG Appliances (4 CPU Cores each) 3 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 4 GB 4 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Sizing for Multiple Service Enabled (Workspace ONE Tunnel and Content on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 standard UAG Appliance (2 CPU Cores) 1 large UAG Appliance (4 CPU Cores) 2 large UAG Appliances (4 CPU Cores each) 4 large UAG Appliances (4 CPU Cores each) 7 large UAG Appliances (4 CPU Cores each) 4 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 4 GB 16 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Sizing for All UEM Services Enabled (Workspace ONE Tunnel, Content, and SEG on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 large UAG Appliance (4 CPU Cores) 2 large UAG Appliance (4 CPU Cores) 9 large UAG Appliances (4 CPU Cores each) 19 large UAG Appliances (4 CPU Cores each) 29 large UAG Appliances (4 CPU Cores each) 19 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 16 GB 16 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Note: Considering SEG transformation enabled

Sizing for Workspace ONE Tunnel (Legacy, non UAG)

Number of Devices Up to 5,000 5,000 to 10,000 10,000 to 40,000 40,000 to 100,000
CPU Cores 1 server with 2 CPU Cores* 2 load-balanced servers with 2 CPU Cores each 2 load-balanced servers with 4 CPU Cores each 4 load-balanced servers with 4 CPU Cores each
RAM (GB) 4 4 each 8 each 16 each
Hard Disk Space (GB) 10 GB for distro (Linux only) 400 MB for installer ~10 GB for log file space**   

*It is possible to deploy only a single Workspace ONE Tunnel server as part of a smaller deployment. However, consider deploying at least 2 load-balanced servers with 2 CPU Cores each regardless of number of devices for uptime and performance purposes.

**About 10 GB is for a typical deployment. Log file size should be scaled based on your log usage and requirements for storing logs.

AirWatch Content Gateway and Unified Access Gateway (Content Gateway) Hardware Sizing

The following assumptions are made regarding server hardware used to host the AirWatch Content Gateway. For sizing above the highest amount, contact Workspace ONE UEM Support. Consider deploying Content Gateway on a separate server from the Workspace ONE Tunnel, as both have different network and system requirements. If your deployment requires that Content Gateway be installed on the same server as Workspace ONE Tunnel, reference the Unified Access Gateway documentation at Unified Access Gateway Deployment and Configuration Guide.

Hardware Sizing

Use the table to determine the sizing requirements for your deployment. Each column represents the requirements for a deployment up to that number of devices. The columns are not cumulative – each column contains the exact requirements for the listed number of devices.

Sizing for Single Service Enabled (Omnissa Content on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 standard UAG Appliance (2 CPU Cores) 1 standard UAG Appliance (2 CPU Cores) 1 large UAG Appliances (4 CPU Cores each) 2 large UAG Appliances (4 CPU Cores each) 3 large UAG Appliances (4 CPU Cores each) 3 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 4 GB 4 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Sizing for Multiple Service Enabled (Workspace ONE Tunnel and Content on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 standard UAG Appliance (2 CPU Cores) 1 large UAG Appliance (4 CPU Cores) 2 large UAG Appliances (4 CPU Cores each) 4 large UAG Appliances (4 CPU Cores each) 7 large UAG Appliances (4 CPU Cores each) 4 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 4 GB 16 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Sizing for All UEM Services Enabled (Workspace ONE Tunnel, Content, and SEG on UAG)

Number of Concurrent Connections Up to 5,000 Up to 10,000 Up to 50,000 Up to 100,000 Up to 150,00 Up to 200,00
CPU Cores 1 large UAG Appliance (4 CPU Cores) 2 large UAG Appliance (4 CPU Cores) 9 large UAG Appliances (4 CPU Cores each) 19 large UAG Appliances (4 CPU Cores each) 29 large UAG Appliances (4 CPU Cores each) 19 X-large UAG Appliances (8 CPU Cores each)
RAM (GB) 16 GB 16 GB 16 GB 16 GB each 16 GB each 32 GB each
Hard Disk Space (GB) 50 GB 50 GB 50 GB 50 GB each 50 GB each 50 GB each

Note: Number of UAG appliances does not include HA, to account for HA, include n+1 appliances.

Note: Considering SEG transformation enabled

Sizing for Content Gateway (Legacy non UAG)

Requirement CPU Cores RAM (GB) Disk Space Notes
VM or Physical Server (64-bit) 2 CPU Core (2.0+ GHz)* *An Intel processor is required. 2 GB+  5 GB  The requirements listed here support basic data query. You may require additional server space if your use case involves the transmission of large encrypted files from a content repository.
Sizing Recommendations
Number of Devices Up to 5,000 5,000 to 10,000 10,000 to 40,000 40,000 to 100,000
CPU Cores 1 server with 2 CPU Cores* 2 load-balanced servers with 2 CPU Cores each 2 load-balanced servers with 4 CPU Cores each 4 load-balanced servers with 4 CPU Cores each
RAM (GB) 4 4 each 8 each 16 each
Hard Disk Space (GB) 10 GB for distro (Linux only) 400 MB for installer ~10 GB for log file space**   

*It is possible to deploy only a single AirWatch Content Gateway server as part of a smaller deployment. However, consider deploying at least 2 load-balanced servers with 2 CPU Cores each regardless of number of devices for uptime and performance purposes.

**About 10 GB is for a typical deployment. Log file size should be scaled based on your log usage and requirements for storing logs.

Email Notification Service Hardware Sizing

The following assumptions are made regarding server hardware used to host the Email Notification Service (ENS) application.

Hardware Sizing - Classic

CPU Cores RAM Hard Disk Storage Notes
2 (Intel processor) 4 GB 10 GB Per 20,000 users

Hardware Sizing - V2

ENS Server CPU Core RAM Hard Disk Storage Notes
App Server 2 (2 GHz Intel processor) 16 GB 50 GB Up to 100,000 users.
Database Server 2 (2 GHz Intel processor) 16 GB 50 GB Up to 100,000 users.

Reports Storage Requirement

To use the new reports framework, which generates reports with greater reliability and faster download times, you must set up reports storage. For instructions on enabling reports storage in the Workspace ONE UEM Console, see Reports Storage Requirements.

Workspace ONE Intelligence Connector

5000 Devices 25,000 Devices 50,000 Devices 100,000 Devices
Servers 1 1 1 1
CPUs 4 (2 GHz Intel processor) 4 (2 GHz Intel processor) 4 (2 GHz Intel processor) 4 (2 GHz Intel processor)
Memory 4GB 8GB 8GB 16GB
Storage 25GB 25GB 25GB 25GB

Adaptiva

Component Requirement
Operating system Windows Server 2008+
Processor Xeon Processor, single quad core (2 GHz Intel processor)
Memory allocation
  • 0 to 5,000 clients - 2048 MB
  • 5,001 to 10,000 clients - 3072 MB
  • 10,001 to 19,999 clients - 5120 MB
  • 20,000 to 49,999 clients - 6144 MB
  • 50,000+ - 8192 MB

Memcached

Component 0-300k devices 300k+ devices
CPU Cores(2 GHz Intel processor) 2 2
RAM 8 GB 16 GB

Dell Factory Provisioning

Factory Provisioning hardware requirements are not necessarily related to the number of devices in your organization. The hardware requirements correlate to the number of concurrent provisioning packages that you request. These hardware requirements assume a maximum package size of 25 GB and a maximum of 3 concurrent packages requested at a time.

Dell Factory Provisioning Service should be installed on a standalone server meeting these requirements.

Dell Factory Provisioning Service Server Requirements
Component 3 Packages (25 GB)
Servers 1
CPUs 2 (2 GHz Intel processor)
Memory 6GB (Windows Server)
Storage 100GB

Workspace ONE Airlift

Workspace ONE Airlift Server Requirements
Component Requirement
Servers 1
CPUs 2 (2 Ghz Intel processor)
Memory 4GB
Storage 1GB disk space for the Airlift application, operating system, and .NET core runtime. Consider allocating 5GB of disk space.

Was this page helpful?

Provide feedback for this topic

Was this topic helpful?

Please do not include any personal or confidential information.

Generating link…